SMOOTH B-TRAIN

Authors

  • T. Bohl et al.

DOI:

https://doi.org/10.23727/CERN-Proceedings-2017-002.155

Abstract

The transmission of the 208Pb82+ Early Beam between the time of Start Ramp up to transition of the LHCION cycles in the SPS has been improved in 2016 by optimising the transfer function of the Frequency Program Data used for the generation of the Master DDS output.

Downloads

Published

2017-12-12