Re-commissioning of the Superconducting Circuits

Authors

  • M. Solfaroli Camillocci CERN, Geneva
  • J. Pojer CERN, Geneva

DOI:

https://doi.org/10.5170/CERN-2015-002.44

Keywords:

LHC, performance, Chamonix.

Abstract

During LS1, the first planned LHC long shutdown, several modifications have been carried out on the technical systems, besides the superconducting circuits consolidation, with the goal of increasing the system performance and availability, while raising the energy to its design value. The plan and present status of the superconducting circuits re-commissioning is presented.