Skip to main content
Skip to main navigation menu
Skip to site footer
Open Menu
CERN Yellow Reports
Current
Archives
About
About the Journal
Submissions
Editorial Team
Privacy Statement
Contact
Search
Register
Login
Home
/
Archives
/
Vol. 2 (2015): Proceedings of the Chamonix 2014 Workshop on LHC Performance
Vol. 2 (2015): Proceedings of the Chamonix 2014 Workshop on LHC Performance
Edited by M. Draper
CERN-2015-002, CERN–ATS–2015–002, ISBN 978–92–9083–413–7, ISSN 0007–8328
DOI:
https://doi.org/10.5170/CERN-2015-002
Published:
2016-02-02
Full text
PDF
Chamonix 2014 conclusions: main points and actions
F. Bordry, F. Zimmermann
1
PDF
Summary of session 1: LS1, HW commissioning, powering tests - coming out of LS1
M. Pojer, L. Ponce
7
PDF
Summary of session 2: Injector status and beams for LHC, dry runs, sector tests with beam
R. Steerenberg, R. Alemany
10
PDF
Summary of session 3: 2015 commissioning with beam
M. Lamont, G. Papotti
13
PDF
Summary of Session 4: LHC - Challenges and Strategy for Run 2
B. Salvachua, M. Zerlauth
16
PDF
Chamonix Workshop, Session 5 – Liu – Summary
M. Meddahi, G. Rumolo
21
PDF
Summary Of Session 6: HL-LHC
O.S. Brüning, P. Ferracin
27
PDF
Summary Of Session 7: Accelerators And Non-LHC Experiment Areas Consolidation Up To LS3
M. Benedikt, F. Sonnemann
31
PDF
Summary Of Session 8: Long Shutdown 2 Strategy And Preparation
J.M. Jimenez, J-Ph Tock
33
PDF
Solved and Remaining non-conformities In the Superconducting Circuits
A. Verweij
39
PDF
Re-commissioning of the Superconducting Circuits
M. Solfaroli Camillocci, J. Pojer
44
PDF
Other Non-solved NC Across The LHC Ring and Potential Impact on Performances
V. Baglin
47
PDF
Expected Impact of Hardware Changes on Impedance and Beam Induced Heating During Run 2
B. Salvant, et al.
53
PDF
RF And ADT after LS1
A. Butterworth, P. Baudrenghien, D. Valuch
60
PDF
LBDS and Kickers after LS1
W. Bartmann, et al.
65
PDF
LHC Injector Complex Status
K. Hanke, et al.
71
PDF
SPS Scrubbing Run in 2014
H. Bartosik, G. Iadarola, G. Rumolo
76
PDF
Operational Beams for the LHC
Y. Papaphilippou, H. Bartosik, G. Rumolo, D. Manglunki
80
PDF
LHC Dry-runs and Machine Check-out
D. Jacquet, M. Albert, R. Fernandez, R. Giachino, M. Solfaroli Camillocci
85
PDF
LHC Transfer Lines and Sector Tests in LHC
V. Kain, R. Alemany
89
PDF
2015 Commissioning with Beam - Introduction
M. Lamont
93
PDF
Experiments Expectations
B. Gorini, E. Meschi
96
PDF
Baseline LHC Machine Parameters and Configuration for the 2015 Proton Run
R. Bruce, et al.
100
PDF
Optics Options for the 2015 LHC Run
M. Giovannozzi
107
PDF
Nominal Cycle and Options
M. Solfaroli Camillocci, M. Lamont, J. Wenninger
111
PDF
Scrubbing: Expectations and Strategy, Long Range Perspective
G. Iadarola, G. Rumolo
114
PDF
Strategy for the first two Months of LHC Beam Commissioning (Commissioning to First Stable Beams)
S. Redaelli, et al.
125
PDF
Overall Strategy for Run 2
J. Wenninger
129
PDF
Machine Protection Strategy for LHC Commissioning and Outlook for Future Challenges
B. Salvachua
134
PDF
Machine Development Priorities
J. Uythoven, G. Arduini, R. Tomas, G. Papotti
138
PDF
BLM Threshold Strategy (UFOs and Quenches)
B. Auchmann, et al.
143
PDF
R2E and Availability
M. Brugger
149
PDF
Linac4: Progress on Hardware and Beam Commissioning
A.M. Lombardi
161
PDF
Protons: Baseline and Alternatives, Studies Plan
G. Rumolo, et al.
166
PDF
Concerns with Low Emittance Beam Operation
V. Kain, et al.
176
PDF
Other Means to Increase the SPS 25 ns Performance – Transverse Plane
H. Bartosik, et al.
180
PDF
Other Means to Increase the SPS 25 ns Performance - Longitudinal Plane
T. Argyropoulos
185
PDF
Ions: Baseline, Studies Plan and Strategy for Pending Options
M. Bodendorfer
192
PDF
HL-LHC Parameter and Lay-out Baseline
P. Fessia, M. Zerlauth
198
PDF
HL-LHC Magnets Roadmap
E. Todesco, F. Savary
202
PDF
HL-LHC RF Roadmap
R. Calaga
209
PDF
HL-LHC Alternative Scenarios
R. Tomas, et al.
217
PDF
Collimation Upgrades for HL-LHC
S. Redaelli, et al.
225
PDF
Down Selection Criteria and MDs Prior to LS3
G. Arduini
232
PDF
Accelerators and non LHC Experiment Areas Consolidation up to LS3 - Linacs
R. Scrivens
239
PDF
PSB and PS Consolidation for LS2 and Beyond
S. Gilardoni, et al.
243
PDF
SPS Consolidation for LS2 and Beyond
J. Ridewood
249
PDF
AD and LEIR Consolidation
T. Eriksson, et al.
257
PDF
North Area and East Area Consolidation
I. Efthymiopoulos, et al.
261
PDF
ISOLDE and n_TOF Consolidation
R. Catherall
265
PDF
Scope of the Long Shutdown 2 (Optimisation of the Period 2015-2018)
J.M. Jimenez
270
PDF
What Has Been Learned from LS1
K. Foraz, J. Coupard, M. Bernardini
272
PDF
Radiation Protection Aspects
D. Forkel-Wirth, et al.
276
PDF
LIU Planned Activities
E. Chapochnikova, et al.
281
PDF
HL-LHC Planned Activities During LS2 - Accelerator
I. Bejar Alonso
284
PDF
LHC Experiments Upgrade and Maintenance
W. Riegler
288
PDF
Long Shutdown 2 @ LHC
M. Bernardini, K. Foraz
290
PDF