Expected Impact of Hardware Changes on Impedance and Beam Induced Heating During Run 2

Authors

  • B. Salvant CERN, Geneva
  • et al.

DOI:

https://doi.org/10.5170/CERN-2015-002.53

Keywords:

LHC, performance, Chamonix.

Abstract

Following the significant impedance related issues that occurred during the LHC Run 1, all involved equipment groups made an impressive effort to assess and reduce the impedance of their near-beam components. Concerning beam induced RF heating, many problems in Run 1 were linked to unexpected non-conformities. Mitigations were put in place but new non-conformities are likely to appear in Run 2, and this is why efficient monitoring and alarms are currently put in place. Besides, known limitations that led to increase the bunch ength
from 1 ns to 1.25 ns were removed, which would open the possibility to try and reduce the target bunch length at top energy. Regardless of the target bunch length, many components will need careful follow up in 2015 (e.g. TDI, BSRT, Roman pots, MKI, BGV). Concerning the LHC impedance, announced hardware changes are expected to be transparent, but the new TCTP and TCSP collimators with BPMs and ferrites should be monitored closely, as well as the modified Roman pots, new TCL4 and especially new TCL6 collimators if they approach the beam with very low gaps at high beam intensity.

Downloads

Published

2016-02-02