Scope of the Long Shutdown 2 (Optimisation of the Period 2015-2018)
DOI:
https://doi.org/10.5170/CERN-2015-002.270Keywords:
LHC, performance, Chamonix.Abstract
During this talk, the scope and mandate of the Long Shutdown 2 (LS2) has been introduced, emphasising on the major differences with respect to LS1. The flexibility to use the winter shutdown to advance part of the works initially planned for LS2 will be considered in the frame of the LS2 discussions, the reporting line has been presented. Finally, the main dates for the LS2 preparation have been presented and will be followed carefully in order to ensure a smooth preparation of the LS2 shutdown.Downloads
Published
2016-02-02
Issue
Section
Article
License
Authors who publish with this publication agree to the following terms:
- CERN retains copyright and publishes the work licensed under the Creative Commons Attribution License 4.0 that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this series.
- Authors are able to enter into separate, additional contractual arrangements for distribution of the published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this series.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (SeeĀ The Effect of Open Access).