LHC, performance, Chamonix.Abstract
During LS1 a number of consolidations and upgrades have been undertaken in the LHC RF, including replacement of a cryomodule (four cavities, beam 2), upgrade of klystron collectors and new solid state crowbar systems. The RF parameters will be outlined in view of the consequences of the increased beam current and energy, and the exotic bunch spacing for the scrubbing beams. The LHC Transverse feedback system (ADT) is also undergoing a major upgrade during LS1, with double the total number of pickups to reduce the noise floor of the system, new beam position electronics and an upgraded digital signal processing system to accommodate all of the extra functionality that had been introduced during LHC Run I, and more sophisticated signal processing algorithms to be deployed for Run II. An external “observation box” to record transverse and longitudinal data from the RF and ADT systems is being implemented.Downloads
Published
2016-02-02
Issue
Section
Article
License
Authors who publish with this publication agree to the following terms:
- CERN retains copyright and publishes the work licensed under the Creative Commons Attribution License 4.0 that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this series.
- Authors are able to enter into separate, additional contractual arrangements for distribution of the published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this series.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).