Ions: Baseline, Studies Plan and Strategy for Pending Options
DOI:
https://doi.org/10.5170/CERN-2015-002.192Keywords:
LHC, performance, Chamonix.Abstract
We will review the performance of the ion injector chain of the LHC during LR1, and the baseline of the upgrades, which are planned in order to reach the performance required after LS2. After overviewing the open issues and a tentative list of planned machine developments, we present the beam characteristics expected during LR2 and beyond.Downloads
Published
2016-02-02
Issue
Section
Article
License
Authors who publish with this publication agree to the following terms:
- CERN retains copyright and publishes the work licensed under the Creative Commons Attribution License 4.0 that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this series.
- Authors are able to enter into separate, additional contractual arrangements for distribution of the published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this series.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).