Chapter 2: East Area renovation

Motivations and general description

Authors

  • J. Bernhard
  • S. Evrard
  • L. Gatignon
  • E. Harrouch
  • H. Wilkens

DOI:

https://doi.org/10.23731/CYRM-2021-004.7

Abstract

This chapter gives a general description of the East Area before and after Long Shutdown 2 (LS2).

 

 

Downloads

Published

2021-12-08